Downloads
Expression of interest for the construction of works package - DMS 5
The Mokolo-Crocodile Rive (West) Water Augementation Project Phase 2A
0. Draft Basic Assessment Report
1. Annexure A CVs
2. Annexure B1 Existing Environmental Authorisation
3. Annexure B2 Preapplication meeting minutes and presentation
4. Annexure B3 Application Form
5. Annexure C1 Database
6. Annexure C2 25 July 2023 Landowner Meeting Minutes
7. Annexure C3 30 August 2023 Eskom Land Division Meeting Minutes
8. Annexure C4 19 September 2023 Eskom Transmission Meeting Minutes
9. Annexure C5 Advertisement 2 Daily Sun
10. Annexure C5 Advertisment 1 Platinum
11. Annexure C6 Site Notices
12. Annexure C7 Notification Letter
13. Annexure D Site Photograph Plate
14. Annexure E EMPr
15. Annexure F1 Aquatic Re-routing of Pipeline Desktop Assessment
16. Annexure F2 Ecology Re-routing of Pipeline Desktop Assessment
17. Annexure F3 Heritage Impact Assessment Specialist Report
18. Annexure F4 Roads and Traffic Baseline Assessment Report
19. Annexure F5 Socio-Economic Baseline Report
20. Annexure F6 Heptofaunal and invertebrate SCC
21. Annexure F7 Pipeline Sensitivity Report
22. Annexure F8 Agriculture Study
23. Annexure G Screening Reports
24. Annexure H Comment Sheet