Downloads
Consulting Services for the Mokolo Crocodile Water Augmentation Project PHASE 2 (MCWAP-2)
0. 2A-R-PS48-98 Draft Basic Assessment Report (Rev A)
1. Annexure A – SIP 19b Letter Mokolo Crocodile River
2. Annexure B1 – DFFE EA First Issue
3. Annexure B3 – DMRE EA 23BP
4. Annexure B4 – DMRE EA 7BP
5. Annexure C1 – 2023 04 11 DFFE MCWAP 2A RMS Pre application Minutes (for Approval)
6. Annexure C3 – SW_CLB_E1_120724_P22
7. Annexure D1 – 20231108 – GIBB Aquatic Ecological Specialists Assessment for client_v4
8. Annexure D2 – Heritage and Palaeontology -MCWAP-2A Phase 2 HIA V3
9. Annexure D3 – GIBB-01-106-002-01 ENIR Report 2023 rev01
10. Annexure D4 – 20240104_GIBB_Terrestrial Biodiversity Assessment_V3
11. Annexure D5 – Nsovo GIBB MACWAP Agro-Ecosystem Assessment_240124
12. Annexure D6 – SWB-REP-240-23_24 0.2
13. Annexure D7 – AQB-REP-241-23_24 0.2
14. Annexure D8 – P23116_REPORTS_01. CIVIL AVIATION COMPLIANCE STATEMENT_REV 02
15. Annexure D9 – Defense Site Sensitivity Verification Report – 12 July 2024
16. Annexure E – EMPr (Rev F)
17. Annexure F1 – Mr D Esterhuizen CV
18. Annexure F2 – Ms U Naicker CV
19. Annexure F3 – Ms M Luthuli CV
Draft Basic Assessment Report for the Re Routing of the High Lift Rising Main (HLRM)
1. Annexure A CVs.pdf
2. Annexure B1 Existing Environmental Authorisation.pdf
3. Annexure B2 Preapplication meeting minutes and presentation.pdf
4. Annexure B3 Application Form.pdf
5. Annexure C1 Database.pdf
6. Annexure C2 25 July 2023 Landowner Meeting Minutes.pdf
7. Annexure C3 30 August 2023 Eskom Land Division Meeting Minutes.pdf
8. Annexure C4 19 September 2023 Eskom Transmission Meeting Minutes.pdf
9. Annexure C5 Advertisement 2 Daily Sun.pdf
10. Annexure C5 Advertisment 1 Platinum.pdf
11. Annexure C6 Site Notices & Proof.pdf
12. Annexure C7 Notification Letter & Proof.pdf
13. Annexure C8 Comments and Responses Report.pdf
14. Annexure D Site Photograph Plate.pdf
15. Annexure E EMPr.pdf
16. Annexure F1 Aquatic Re-routing of Pipeline Desktop Assessment.pdf
17. Annexure F2 Ecology Re-routing of Pipeline Desktop Assessment.pdf
18. Annexure F3 Heritage Impact Assessment Specialist Report.pdf
19. Annexure F4 Roads and Traffic Baseline Assessment Report.pdf
20. Annexure F5 Socio-Economic Baseline Report.pdf
21. Annexure F6 Heptofaunal and invertebrate SCC.pdf
22. Annexure F7 Pipeline Sensitivity Report.pdf
23. Annexure F8 Agriculture Study.pdf
24. Annexure G Screening Reports.pdf
Draft Basic Assessment Report for Re routing HLRM.pdf